Has a contractor been contacted? (not required).
Has an architecture been contacted? (not required)
USE THIS CHECKLIST TO ENSURE THAT ALL ITEMS NECESSARY TO APPLY THE ICCD FACADE/SIGNAGE GRANT HAVE BEEN COMPLETED BEFORE SUBMITTING YOUR APPLICATION. CHECK ALL THAT APPLY.
Drawing mode selected. Drawing requires a mouse or touchpad. For keyboard accessibility, select Type or Upload.